LilyyBoo6761 LilyyBoo6761
  • 19-04-2018
  • Mathematics
contestada

A worker can complete the assembly of 15 DVD players in 6 hours. At this rate, how many can the worker complete in a 40-hour work week?

Respuesta :

Аноним Аноним
  • 19-04-2018
6 hours = 15 DVD

Find 1 hour:
1 hour = 15 ÷ 6 = 2.5 DVD

Find 40 hours:
40 hours = 40 x 2.5 = 100 DVD

Answer: A worker can assembled 100 DVDs in 40 hours.
Answer Link

Otras preguntas

describe the role of each 3 of RNA​
PLS HELP I NEED THIS DONE Look at the image and choose the option with the correct plate and country corresponding to the image. Look at the image and choose th
what's the difference between protein and fixed oils ​
I organized a thousands of women to March for equal rights in Washington DC who am I​
Write an expression to find out the perimeter of a rectangle with a length of 10mm and width of x.
What is the answer key to the turquoise ring unit 2 4th grade
what is bio diversity hot spot?​
Please help me y’all
How do I solve for this math equation Solve for A=(1,2)bh
Can someone help I think I know it but I wanna make sure I’m right