"what is a common problem in calculating start and finish times? provide an example. "

Respuesta :

W0lf93
W0lf93 W0lf93
  • 01-02-2018
One of the main problems in calculating start and finish times is deciding how fast people work. People work at different paces. For example, it might take one worker two days to finish rewriting the code for a new computer system, but it might not necessarily take two workers half a day to finish the same project.
Answer Link

Otras preguntas

15 in. 1. A scale drawing of a patio is shown at right. The scale is 4 inches : 6.8 feet. What are the length and width of the patio? Find the patio's area. Len
What is the slope of the line passing through (-3,5) and (5,-3)? slope = -1 Slope = 0 slope = 1 no slope
THE TELL TALE HEART Who arrives at the narrators door at night?
Geometry help PLZ!!!
A 4.0-kg falcon catches a 1.0-kg dove from behind in midair. What is their velocity after impact if the falcon’s velocity is initially 3.0 m/s and the dove’s ve
What is the value of x?
How do you make a box and whisker plot? THAHK YOU
(9 x 10 ^10) - ( 4x10^10)
A firm's cash flow from financing activities includes: A. Cash paid for merchandise purchased B. Cash paid to acquire treasury stock C. Cash received from sale
An extended metaphor is a comparison that is developed at length, perhaps over several line of writing or even an entire work, such as a poem. I'm Psalm 23, how