juile5962 juile5962
  • 20-09-2017
  • Business
contestada

The costs normally required to manufacture a product, which are calculated from historical costs and any changes from that, are known as ____. standard costs abbreviated costs known costs estimated costs

Respuesta :

Аноним Аноним
  • 22-09-2017
a. standard costs is the correct answer 
Answer Link

Otras preguntas

For the following set of data, find the mean, median and mode. age of children Danielle babysits: 6,9,2,4,3,6,5 (3 Points) Mean = 4 years old Mean = 5 year old
how did eugene talmadge feel about the new deal
2 × (5 × 6) = Enter the correct product in the box.(2 × 5) × 6 =
What is the area of the triangle? 8 4 units2
what does ICT stand for?​
Which of the following statements about the importance of carbon is NOT true ? A . All living things are made or carbon B . Carbon is absorbed into animals and
I need halp puh-lease What is the value of the expression: x2 + y2 + x - y when x = -1 and y = 3 6 8 12 16 and if u can plz tell why
A marathon runner runs a 200m sprint in 10 seconds. It is known that he started standing still. Then determine the acceleration achieved by him knowing that his
i need help PLEASEEEEEEEEEEEEEEE 20 points baes
someone please help me with this please