Where would the initial functional baseline be reviewed to ensure that it covers all the government's capability needs?

Respuesta :

metchelle
metchelle metchelle
  • 29-06-2017
The answer to the question above is CRITICAL DESIGN REVIEW. This is where the initial functional baseline would be reviewed in order to make sure that it covers all the capability needs of the government. The Critical Design Review is also known as CDR. This makes sure that the system, particularly the government, is able to to proceed in different processes within a given cost and risk.
Answer Link

Otras preguntas

A recipe requires 1/4 ib of onion to make 3 servings of soup. Mark has 1 1/2 ib of onions. How many servings can mark make?
what is chemergy chemestry?
The atmosphere can produce the same effects as a prism when the Sun is low in the sky. True False
Command economies use __________ planning to maintain government control. A. social B. central C. community D. regional
the pizza slice served at O'Connor's pizza place are 1/4 of a whole pizza. There are three pizzas ready to be served. 14 children come in for lunch. Is there en
What was the Japanese name for the are of China that Japan concord was?
A light-year is a unit of
During which season is the sun lowest in the sky? (This is science.)
What are the 3 main factors that affect climate?
Reagan wanted a strong: educational system military legislature court system