A certain job takes 2 people 50 hours to complete. How many people are needed to complete the job in 25 hours?

Respuesta :

ns97095 ns97095
  • 20-11-2021

Answer:

4 people

Step-by-step explanation:

Answer Link
diana061 diana061
  • 20-11-2021
Answer, 1. 50 divided by 2 is 25. So both people take 25 hours each to complete the job. Since it’s only a 25 hours job, it will only take 1 person to complete the job.
Answer Link

Otras preguntas

Momentum= mass x velocity 1507.8 x 8 = 12,506
How many different kinds of monomers are there in nucleic acids?
Explain the function of accessory pigments.
The esophagus, stomach, and intestine together are part of a level of organization called:
Two triangles are similar only if they share a congruent angle and two congruent sides adjacent to the angle.T/F explain plz
a rectangle fish pond is 8 feet longer than it is wide. a wooden walk 2ft wide is placed around the pond. the area covered by the pond and the walk is 160 ft sq
What kinds of substances besides water can be involved in hydrogen bonding?
is the freshwater eel a flatworm or an annelid
mane one war fought by the united state in the 1800s
six nickels is what percent of $1.00?