prashant123 prashant123
  • 17-04-2021
  • Mathematics
contestada

IF 30 Men Car do a piece of Work in 30 days the
in how many days 10 men can complete the Same work​

Respuesta :

Аноним Аноним
  • 17-04-2021

Answer:

let, the days for 10 men be x

  • 30/10=x/30
  • 900=10x
  • x=900/10
  • x=90

so 10 men can complete the same work in 90days.

Hope it helps.

Answer Link
Shanedm
Shanedm Shanedm
  • 17-04-2021
10 days because 30 men = 30 days, so in that logic 10 days = 10 men
Answer Link

Otras preguntas

Fernando: Tengo que comprar ropa para la fiesta.        Víctor: ¿Vas a comprar _____?
which quadrant is y<-5
A king cobra is 4.237 meters long. Round the length tothe nearest meter
Which listening skill involves paying attention to nonverbal messages such as the person’s posture and body movement?
Which of the demands were met in part by the national assembly on august 4 1789?
What benefits did European explorers hope to gain through their discoveries in the Americas?
Wich conquestadors gained control of the inca
Is it possible for a composite number to have more than one prime factorization?
For the fourth-shell orbital shown below, what are the principal quantum number, n, and the angular momentum quantum number, l
The Chang Jiang flows eastwards into what sea?