kamalabaniya98048 kamalabaniya98048
  • 19-01-2021
  • Physics
contestada

A and B together can do 1 by 6 of a work in a day is 1 by 10 of the work in a day how much work can do in 1 day​

Respuesta :

Emily20210
Emily20210 Emily20210
  • 19-01-2021

Answer:

hih

Explanation:

Answer Link

Otras preguntas

The genetics and the environment start affecting our development_____.a) after we are born b) before we are born c) right before we die d) when we acquire langu
Broad trunked tropical tree with acidic gourd shaped fruit whose bark is used to make paper, cloth, and rope is called?
Excerpt taken from The Historic Rise of Old Hickory by Suzanne B. Williams Four major candidates ran in the 1824 election, all under the "Democratic-Republican
Where people refuse to leave a restaurant or other establishment until their demands are met?
The boiling point of Compound 1 is 120°C. What is the boiling point of Compound 2?a) 240°Cb) 120°Cc) -120°Cd) 0°Ce) Not enough information to determine
When answer in the inhaled air reaches the answer, it is answer into the blood and answer to all parts of the body. answer is also transported by the blood to t
Ignoring friction, how tall of a hill would this freight train have to climb to come to a full stop? a) 66.5 meters b) 861 meters c) 133 meters d) 1.84 kilomete
How many aluminum atoms are there in 3.50 grams of Al₂O₃? (Al-27 g/mol; 0=16 g/mol) A. 1.68 x 10²²B. 2.07 x 10²²C. 4.13 x 10²²D. 4.90 x 10²²
I2 + Na2SO3 + Na OH _ NaI+Na2SO4+H2O​
Which method of calculating forecast error is best used when the forecaster wants to know whether positive and negative errors cancel each other out, indicating