Tayloxosupnerodine
Tayloxosupnerodine Tayloxosupnerodine
  • 17-10-2016
  • Business
contestada

The type of budget that is prepared for the expected capacity level only is called a _______. static budget. flexible budget. continuous budget. master budget.

Respuesta :

Erudite1
Erudite1 Erudite1
  • 28-10-2016
The budget that is prepared for the expected capacity level only is called a fixed or static budget.
Answer Link

Otras preguntas

A bag contains 4 blue coins and 8 red coins. A coin is removed at random and replaced by three of the other color. Part 2 out of 3 If the first coin removed is
2x - y = 5 3x + 2y = 4 Solve the system of equations. A) (3, 1) B) (0, 2) C) (2, -1) D) ( 9 7 , 17 7 )
Which of the following is the value of "B",base?
Long-term goals require __________ money and __________ effort than short-term goals. A. less . . . less B. less . . . more C. more . . . more D. more . . . les
People from individualist cultures are more likely to experience dissonance _____, while people from collectivist cultures are more likely to experience dissona
How do you answer it and what's the answer
Which statement about the exposition essay is true?
Solve the formula for the specified variable. V=CMU for C
The first step in buying a car is deciding what type of car you both need and want. A. True b. False
Read the theme statement Cassie created based on her reading of White Fang. White Fang is part dog and part wolf. Has Cassie created her theme statement correct